各位老師、同仁及同學好:
為改善醫環館頂樓東、西側地板及2樓西側戶外花檯排水溝之漏水情形,預計於 11月9日至11月30日,每日上午9:00至下午17:00 進行防漏水工程,施工範圍及相關資訊如下:
▪ 醫環館頂樓東側及西側地板(含排氣風管銜接處)。
▪ 醫環館2樓西側戶外花檯下方排水溝(含磁磚)。
▪ 日期:115年11月9日(星期一)至11月30日(星期一)
▪ 時間:上午9:00至下午17:00
Dear All,
To address water leakage issues on the east and west rooftop floors and in the drainage channel beneath the outdoor planter on the west side of the 2nd floor of the BMES Building, waterproofing work is scheduled to take place from November 9 to November 30, 2026, daily from 9:00 AM to 5:00 PM. The construction details are as follows:
▪ East and west rooftop floors of the building, including the joints connecting to the ventilation ducts.
▪ Drainage channel beneath the outdoor planter on the west side of the 2nd floor, including the floor tiles.
▪ Date: November 9 (Monday) to November 30 (Monday), 2026
▪ Time: 9:00 AM–5:00 PM daily